On September 30, a report on research conducted at the laboratory jig was posted on the RFCS portal – Deliverable 3.1 ‘Results of laboratory tests of mine wastes of jig beneficiation.’ The outcome of the work was the acquisition of input data for the design of a new device for the industrial separation of mining waste and the preparation of samples for the next planned analyses in the project.
Deliverable 3.1 “’Results of laboratory tests of mine wastes of jig beneficiation”