The next two reports summarizing the work carried out under tasks T3.2 and T3.3 have been posted on the portal.
Deliverable 3.2 “Physicochemical analyses and mechanical property tests of the separation products”, prepared by GIG, contains the results of laboratory tests on waste samples separated in the jigging process into a coal-bearing fraction and a mineral fraction.
Deliverable 3.3 “Analysis of possibilities of using selected fractions from mine wastes for recovery of rare trace elements and power production”, prepared by ITPE, includes an assessment of the potential for utilizing selected fractions of mining waste for the recovery of rare trace elements and power production.